东莞市长安鼎邦模具厂
Product

Hotline

134-2348-2738

Milk bottle mold

2022-05-07


  

Product name: Milk bottle mold

Process description: molding - processing - quality inspection

Development cycle: 3-5 days for sample mold, 7-12 days for production mold

Project quotation: within 3 hours

Customization cycle: 1-3 to provide structural samples, 3-5 to provide finished samples

Bulk production capacity: consulting online customer service


Feeding bottle mold customization needs to be quoted according to the processing difficulty of samples or drawings provided, please confirm with the salesman down ↓ down ↓

1. Mold accuracy tolerance requirements

2. Equipment needed for mold processing

3. Quantity of molds (1PCS is ok, large quantity is preferred)

4. Other special requirements!


Requirements on 3D drawing file of milk bottle mold opening

You need to provide CAD files and 3D models, which can be in the following format:

1.CAD format: DWG, DXF, PDF

2.3D model format: SLDPRT, STEP, IGS, STP, X-T, PRT


[返回]   
下篇:暂无
+86-134-2348-2738
Add:Room 101, Building 1, No. 31, Rongfu Road, Changan Town, Dongguan City
Copyright © 2022 Dongguan Changan Dingbang Mold Factory All right reversed.